gca21-en
no way to compare when less than two revisions
Differences
This shows you the differences between two versions of the page.
— | gca21-en [2018/11/12 08:56] (current) – created - external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== GCA21 Reverse loop switch for heavy loads (up to 10 Amp). ====== | ||
+ | |||
+ | [[english|{{ | ||
+ | [[english|Content]] -> [[hardware-en|Hardware]] -> [[hardware-en# | ||
+ | * [[mgv-overview-en|The GCA Family]] | ||
+ | |||
+ | \\ | ||
+ | |||
+ | ^^^^By Peter Giling ^^^^ | ||
+ | \\ | ||
+ | |||
+ | ===== This page is under development. ===== | ||
+ | \\ | ||
+ | \\ | ||
+ | ===== Description ===== | ||
+ | Bsed on the use of GCA102, which already have been used many times, and still is, \\ | ||
+ | there was a need for something more useful for large current like G-Track or track 1.\\ | ||
+ | Also because of the more and more getting popular use of hall sensors, this unit is provided with connections for only that.\\ | ||
+ | The on-board relays can switch up to 10 Amp, so that would be enough for one train.\\ | ||
+ | The basic idea was to use it together with GCA179 for hall sensors,\ but the plan is going\\ | ||
+ | to change to the option of having connections directly for hall sensors.\\ | ||
+ | Additionally it is possible to use GCA194 current detector to connect to this unit.\\ | ||
+ | Four hall sensors are needed, one sensor at each side of the railcut, and that at both sides of the loop itself.\\ | ||
+ | These pairs of halls ensors could be connected parallel, making less wiring necessary.\\ | ||
+ | The input is made in a way that longer lines are possible, and unlike GCA102, the unit does not\\ | ||
+ | provide extra sensor inputs for use as feed-back for blocks.\\ | ||
+ | This is mainly because the complete unit is powered by the digital rail power itself.\\ | ||
+ | Hall sensors are able to work with max 18 Volts, so an extra regulator IC3 was needed to achieve 12Volt for the free hall sensor circuit.\\ | ||
+ | Because it is important to maintain the position of the relays, (on should always be ON),\\ | ||
+ | the processor stored the last position in eeprom, so when rail power is shortly OFF and comes back ON , the correct situation of relays will reassured.\\ | ||
+ | Instead of using the railpower, it also possible to supply with a 24 V dc (+/- 100 mA).\\ | ||
+ | In that case, do NOT assemble the bridge rectifier B1.\\ | ||
+ | |||
+ | |||
+ | |||
+ | | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Hardware ===== | ||
+ | | {{: | ||
+ | | {{: | ||
+ | |||
+ | This is just a preview, objects are liable to changes! | ||
gca21-en.txt · Last modified: 2018/11/12 08:56 by 127.0.0.1